The CSPDC partnered with the Town of Elkton and VDOT to develop a town-wide Pedestrian Masterplan to prioritize the Town’s investments in pedestrian infrastructure. The CSPDC helped evaluate the condition of the Town’s existing pedestrian network, and developed an evaluation criteria to prioritize each of the 20 potential sidewalk projects that the Town can include in its comprehensive plan, future capital improvement plans, and as a baseline for future grant funding applications.
The study will be complete in June 2020 and is the result of the CSPDC’s Rural Work Program, which conducts one study every fiscal year on a transportation-related issue for our rural partners. Please contact the CSPDC if your locality is interested in conducting a study in Fiscal Year 2021.